Riverlife Task Force

Mon Wharf Landing

Phase Two: Smithfield Street Switchback

  • A vertical connection from the Smithfield Street Bridge to the Landing
  • Stairs and an ADA accessible ramp
  • New lighting, benches and signage

Status: Final design is underway and fund-raising for construction has begun, with the goal of completion in 2008.